Stephen Galdi, Natalie Mottl
Abstract:
The team’s task is to test, troubleshoot, and complete the scale model of the weir system developed by last semester’s team. By the end of the semester, the team will create as etup and video that accurately portrays the behavior of the water through the full scale weir system. The Fabrication Team aims to create a plant that is easier to operate, troubleshoot, and build.