Primary Author: Daniel Cohen
Secondary Author: Travis Hartway
Abstract:
The fabrication team developed fabrication methods and designs to be used at AguaClara construction sites that are feasible and economical. We worked to improve hole cutting/drilling methods, designed entrance tank components such as trash racks and an adjustable overflow weir, investigated methods to attach pipes to the inlet manifold, and sought a longer lasting on-site power source. We developed a much better understanding of the AguaClara project and made several valuable contributions to implement in future construction sites.