Pablo Nistal, Kadambari Suri, Larissa Sakiyama, Priya Aggarwal
Abstract
The Ram Pump subteam was charged with designing and optimizing a pump to
elevate a small amount of water in the plants to fill chemical stock tanks and to provide
bathroom services. A common testing issue has been low effluent flow rate compared to what
is expected at the plant. The Spring 2015 ram pump team has designed a new ramp pump
system which allows users of the ram pump to adjust the size of the spring in the ram pump to
provide for maximum efficiency. The team is working on testing each part of the system,
seeing what can be fixed and changed, and then implementing those changes. The team has
found that ultimately springs of varying spring constants and lengths provide similar flow
rates. The team has also found that an air chamber greatly improves the flow rate of the
system and bigger air chambers provide better flow rate than smaller ones.