Sidney Lok, Sung Min Kim, Sean King
Abstract:
The Spring 2017 semester 1 L/s Plant Testing subteam's objectives were to improve upon the previous work done on the design of the 1 L/s pilot plant in Honduras. This semester, the primary goals of the 1 L/s Plant Testing subteam were to complete the 1 L/s plant and to design and fabricate a tapered flocculator. This tapered flocculator design would be used to decide whether tapered flocculation would improve overall water treatment in the 1 L/s plant.